
Brand new oak frame building. Lime inserted panels.
Just Limewash over the stonework.
Wonderful early 17th Century building, with much original render. Simply repaired with a matching PUTTY LIME mix and Limewashed.
Regency facade. New PUTTY Lime render and mouldings.
Roedean School. Brighton. 250 yards from the sea. Huge damp and salt problems. This is our solution. Quite simply, lime putty slurry coating and limewash applied to the concrete render has stopped the moisture ingress. We have covered in excess of 3000m2 (summer 2008) of the main facades. The building is drying....
See our Roedean page for the proof of the lime benefits.
|